Nationwide Solar Permitting For First-Attempt Approval.
Filed within 24 to 48 hours across 15,000+ jurisdictions, with a 95% first-attempt approval rate. We own the file through to approval, including every correction along the way. Residential and commercial solar, energy storage, EV chargers, and generators. Nationwide.
What permitting covers.
Every EnergyScape Renewables permitting package is tailored to the specific requirements of the reviewing authority, with documentation, design, compliance, and submission managed through one streamlined process.
Application preparation
Forms, cover sheets, site plans, and supporting documentation assembled to the exact requirements of the reviewing authority.
Jurisdiction research
Fees, submission method, required attachments, and local amendments confirmed against our database before anything is filed.
Filing, however they take it
Online portals, SolarAPP+ where the jurisdiction accepts it, or manual submission where it does not.
AHJ follow-up
We track the file through review and stay on the authority rather than waiting for them to come back to us.
Corrections and resubmittals
Redlines answered, drawings revised, package refiled. No extra charge and no new order.
Issued permit delivered
The approved permit lands on your project, ready to schedule the install against.
Filing a permit is easy. Getting it approved is the job.
Most providers submit the package and send you the confirmation number. We stay on the file until the permit is issued. 300+ installers use us, including six of the top ten on the Top Solar Contractors list.
We answer the corrections
When a reviewer comes back with redlines, we make the changes and resubmit at no extra charge. You are not pulled into a conversation with a plans examiner.
Built on 15,000 jurisdictions
Every submission is prepared against what that specific authority requires, including local amendments and the format they accept. Every rejection we handle feeds back in.
The same team drew it
When the plan set and the permit run through one company, nobody hands a package between vendors and nobody blames the other side when it bounces.
How it works.
Five steps from an uploaded project to an issued permit — scroll to walk through each one.
Send the project
Submit through Sunscape, or we work inside your own CRM as an extension of your team.
Design and stamp
Our team produces the plan set and, where the jurisdiction requires it, gets the drawings sealed.
Package and verify
The permitting team assembles the application and verifies every requirement against our AHJ and utility database.
Submitted
Filed through whatever channel the authority uses: online portal, SolarAPP+, email, or manual submission.
Followed through
We stay on the authority and answer corrections at no extra charge until the permit is issued.
Frequently asked questions
Still have a question?
Can't find the answer you're looking for? Send us an email and we'll get back to you as soon as possible.
Contact usWe submit it and stay on the file until it is issued, including answering corrections and resubmitting.
We revise and resubmit at no extra charge. Your team is not pulled into a conversation with a plans examiner.
We file within 24 to 48 hours. After that the review window belongs to the authority and varies widely by jurisdiction. 95% of our submissions clear on the first attempt.
Yes. Where a jurisdiction accepts SolarAPP+, we file through it.
Our database covers 15,000+ AHJs and 1,000+ utilities. Send your market list and we will confirm coverage and typical review windows for each.
Yes. Send your drawings and we prepare and file the package.
No. Submit through Sunscape, or we work inside your own CRM as an extension of your team.
No. Twenty permits a month or two hundred, same process.