Greenlight · AI QC by EnergyScape

Catch The Rejection Before The Reviewer Does.

99% first-pass approval Trained on 350,000+ designs

Greenlight is our in-house AI QC tool. It checks every plan set against local code, design standards, and the AHJ and utility records in Bedrock before a human reviewer signs off.

Trained on 350,000+ designs drafted by our own team. Issues surface before submission, not two weeks into review.

Why this QC is different

A checklist reads the code. Greenlight reads the reviewer.

Generic plan checkers test a drawing against a code book. Greenlight tests it against what that specific jurisdiction enforces and what its reviewers have already rejected, because it is wired into the same database our permit team files against.

01

Trained by our own designers

Built in house on 350,000+ processed designs and tuned by the people who draft the sets, not on a generic code corpus.

02

Wired into Bedrock

Direct access to 15,000+ AHJs and 1,000+ utilities, including local amendments and every rejection we have handled.

03

AI first, human last

Greenlight runs the full check and flags every issue. A human reviewer resolves the flags and signs off. Nothing ships on the AI alone.

Greenlight job documents, QC check results, and QC dashboard screens across three monitors
What it checks

Every sheet, every run.

01

Site layout and setbacks

Array placement, roof edges, ridge and hip pathways, and ground-mount clearances against the AHJ record.

02

Fire access

Pathway widths and locations checked against the fire code and local amendments in force.

Engineer reviewing a stamped solar plan set at a workstation
03

Structural

Attachment spacing, rafter spans, wind and snow loads against the ASCE 7 edition the jurisdiction references.

04

String sizing

Voltage and current limits checked against module and inverter datasheets at local temperature extremes.

05

Conductors and OCPD

Conductor sizing, conduit fill, breaker ratings, and the 120% rule or supply-side connection method.

06

Grounding and bonding

Equipment grounding, grounding electrode, and bonding details against current NEC and listings.

07

Rapid shutdown

Rapid shutdown method, equipment, and labeling for the NEC edition in force.

08

Labels and placards

Placard schedule, wording, and placement for NEC and the local amendments that apply.

Solar plan set documentation ready for submission
09

Equipment consistency

Modules, inverters, and racking matched across every sheet, spec sheet, and the bill of materials.

10

Sheet completeness

Required sheets, title block, sheet order, and attachments for that jurisdiction's submission format.

11

Utility requirements

Interconnection method, metering, disconnect placement, and one-line format for the serving utility.

12

Known rejections

Every redline this AHJ or utility has issued before, checked on every new set for that market.

350k+ Designs it learned from
99% First-pass approval
15,000+ AHJs checked against
1,000+ Utilities checked against
Every Set, before it leaves
Minutes Per project, not days
How it works

How a set goes through Greenlight.

Drafted to the jurisdiction's requirements, checked against code and known rejections, then held until a human signs off.

05 / steps
01
24 HOURS

Set drafted

Our team drafts the plan set to the jurisdiction's requirements.

02
AUTOMATIC

Record matched

Greenlight pulls the AHJ and utility record for the address from Bedrock.

03
MINUTES

Full check

Every sheet checked against code, design standards, and known rejections.

04
BEFORE SIGN-OFF

Flags resolved

A human reviewer works through every flag. The set is held until each one clears.

05
READY TO SUBMIT

Delivered

Permit-ready set on your project. 99% clear on the first pass.

Where it runs

Greenlight is already on your sets.

If you use our engineering services, Greenlight has checked your work. It sits between our drafting team and your permit.

01

Bedrock

What it checks against

The AHJ and utility database behind every check: 15,000+ AHJs, 1,000+ utilities, and their rejection history.

Explore Bedrock
02

Plan sets & stamps

What it checks

Every plan set runs through Greenlight before delivery, and every stamped set before it goes for seal.

See plan sets
03

Sunscape

Where you see it

QC status and resolved flags land on the Sunscape project with the delivered set.

Explore Sunscape
Side by side

Manual peer review versus Greenlight.

Manual peer review
Greenlight
Quality depends on who checks and how tired they are
The same full check on every set
Local amendments checked from memory
Amendments pulled from 15,000+ AHJ records
Last month's rejection known to one reviewer
Every past rejection checked automatically
Spot checks under deadline, not every detail
Every sheet, every detail, every run
Issues found by the AHJ, two weeks later
Issues found before submission, then signed off by a human
The flag report

Every flag says what, where, and why.

Greenlight doesn't just pass or fail a set. Each flag points to the sheet, names the issue, and cites the rule or past rejection behind it, so the reviewer fixes it in minutes instead of hunting for it.

  • Flags tied to the sheet and detail
  • Source cited: NEC, local amendment, utility, or rejection
  • Severity marked so critical issues are fixed first
  • Resolved flags logged against the project
Live on every Greenlight run
  1. Flag raised

    Found
  2. Source cited

    Cited
  3. Severity marked

    Marked
  4. Reviewer resolves

    Resolving
  5. Logged to the project

    Recorded
Aerial view of a solar array

Submit sets the reviewer has nothing to say about.

Greenlight isn't sold on its own. Once you onboard with EnergyScape Renewables, every plan set and stamp we deliver runs through it, with no extra step on your side and no extra cost. Send your markets and volume to get started.

FAQs

Frequently asked questions

Still have a question?

Can't find the answer you're looking for? Send us an email and we'll get back to you as soon as possible.

Contact us

Our in-house AI QC tool. It checks every plan set against local code, design standards, and our AHJ and utility database before a human reviewer signs off.

No. Greenlight flags issues and a human reviewer resolves them and signs off. The set is held until every flag clears.

Current NEC and the local amendments for that jurisdiction, design standards, manufacturer datasheets, and Bedrock: 15,000+ AHJs, 1,000+ utilities, and every rejection we have handled.

On 350,000+ designs processed by our own team, and tuned by the drafters who produce the sets.

Residential solar today, with commercial, energy storage, EV charger, and generator projects on the roadmap.

If you use our plan sets or PE stamping, yes. Every set runs through Greenlight before delivery at no extra charge.

Send your volume and markets through the form and we'll walk through the options for installer-drafted sets.